Fuzhou Municipal Solid Waste Incineration (Phase II) Project (BOT+EPC)

Project details

Project industry

electricity

Field type

Waste incineration power generation

Total budget investment

150 million yuan

Nature of investment

Non-governmental investment

Funds in place

Is being implemented

Project construction grade

Medium industry standard

It is expected to start construction year and month

2018

Expected year-end

2019

Provinces

Jiangxi

Local city

Fuzhou City

Equipment source

domestic purchase

Progress stage

Design tender

Business description

Project main equipment

Boilers, steam turbines, generators, condensers, soot blowers, garbage trucks, loadometers, cranes, garbage hoppers, grab cranes, incinerators, waste heat boilers, waste heat recovery boilers, pushback...

Din Rail Terminal Block

Basic Features
1. The terminal has universal mounting feet so that it can be installed on U-rail NC 35 and G-rail NC32.
2. The closed screw guide hole ensures ideal screwdriver operation.
3. Equipped with uniform accessories for terminals of multiple cross-section grades, such as end plates, grouping partitions, etc.
4. Potential distribution can be achieved by inserting a fixed bridge in the center of the terminal or an edge-plug bridge inserted into the wire cavity.
5. The grounding terminal and the N-line slider breaking terminal with the same shape as the common terminal.
6. Using the identification system ZT, unified terminal identification can be realized.
7. The rich graphics enhance the three-dimensional sense of the wiring system.

Din Rail Terminal Block,Din Rail Fuse Terminal Block,Din Rail Busbar Terminal Block,Din Rail Power Terminal Blocks

Sichuan Xinlian electronic science and technology Company , https://www.sztmlchs.com